Having a termite baiting program, there can be no absolute guarantee of long-term protection of nearby buildings. There can be other termite nests nearby the building which do not find the bait stations. Your home is a considerably bigger bait station. Other termite nests may exist in trees, under concrete on-ground flooring and in-fill patios of neighboring properties. .

The Sentricon baits are placed in their in-ground bait stations after removal of the infested timber therein. This may involve sufficient disruption of the termites such that they avoid the in-ground Sentricon bait station, entirely.

This serious short-coming is defeat by the patented Exterra Termite Stations in which the lumber is aligned around the cylinder such that the lure can be inserted with no disturbance of these termites present.

RECOMMENDATION: Exterra or Sentricon be used where a comprehensive chemical soil barrier treatment using Termidor or Premise is not practicable or desirable, and where a several thousand termites are likely to consume the bait.

Termite Control Maintenance - Questions


A termite monitoring and baiting software can be integrated with a range of methods including (1) drilling susceptible trees and eradication of any termite nest located therein, and (2) in conjunction with a follow up chemical soil treatment using Termidor or Premise.

Rapid termite colony development and building infestation is generally associated with a readily available timber food and moisture source nearby the central nest. In addition, buildings are often constructed in a way that allow termites to gain undetectable entry from the soil to the structural timbers of the building. Listed below are a few useful recommendations for the home owner to carry out in order to decrease the possibility of termite activity inside a building. .

Moisture exclusion from inside the wall cavities, around the base of the building and sub-floor area (if any). Water run-off can be excluded from a sub floor region by the installation of ag-drains. Make sure there is sufficient cross flow ventilation in the sub floor area. In addition, a skilled plumber ought to be engaged to ensure there's no water leakage from plumbing pipes in the bathroom, the shower recess, kitchen, down pipes, guttering and air conditioning unit leak.

Some Of Termite Control Maintenance


Please note: high humidity, dampness or moisture accumulating in a wall cavity is obviously high risk to encouraging large scale termite activity inside the building. .

Elimination of any wood in contact with the soil. Timbers should be stored above ground to permit whole inspection of subterranean termite activity (coming out of the soil thereunder). Any landscaping using timber chip mulch and railroad sleepers should definitely be removed, as they supply prepared food supply to assist in rapid termite colony development. .

Ensure inspection access is unimpeded, especially in sub-floor regions (suspended flooring ) in order to look for evidence of termite activity. If your property is on a concrete slab on ground flooring, be certain you can inspect the entire external slab edge for evidence of termite mud-shelter tubes. Do NOT allow this region to be coated by pavers, landscaping, planter pots, etcas termites often gain entry into the walls of a building via this area, especially through external weep holes and minute (2 mm) openings in the mortar in brick-work. .

4 Simple Techniques For Termite Control Machine


Should you find live termites or termite damaged timbers DO NOT disturb the area. DO NOT use spray can or insecticides on the termites. If sufficiently disturbed, the termites are likely to move everywhere, and might not be rediscovered until further evident damage has been done. The termite controller can introduce Intrigue termite dust or Exterra termite bait right to the live termites present in an effort to eliminate the entire termite colony - as mentioned in detail above. .

Consumer Note: the installation of a chemical soil barrier does not negate the need for regular competent inspections - at least 3 to 6 months where the termite risk is elevated.

The Single Strategy To Use For Termite Control MaintenanceSome Ideas on Termite Control Maintenance You Should Know
We recommend 3 or 6 monthly inspections have been performed for the initial two years following a chemical soil treatment. Monitoring of "stand-alone" baiting systems

BE AWARE the right identification of harmful termite species, inspection of a building for tell-tale signs, analysis of circumstances and implementation of an effective termkite control program requires expert skill and judgement based upon professional training and extensive field-work experience in termite control in a wide variety of circumstances.

The smart Trick of Termite Control Machine That Nobody is Talking About


Termites, also known as white ants, are little soft bodied insects about half the size of a match-head. It is projected that they cause more damage to houses in Australia than from flood, fire and storms combined. The harm is so good that visit site termite damage is not covered by insurance meaning its an issue you need to keep on top of with Termite Pest Control.